Saturday, January 22, 2011
Wednesday, December 29, 2010
The Powerplant transplant is complete!
Tuesday, November 23, 2010
Gauge cluster Refurb
Friday, November 5, 2010
Its headed back in the right direction.
Got the 318is drop in fuel pump and sender all wired up. I decided to run the battery cable down the other side of the car as it is in a better position to hook up to the engine harness if it pops out of the passenger side firewall.
Pedal box install went fairly smooth. I still need to adjust the clutch and brake pedal Height but its probably drivable like this.
Wiring in the Chassis side of the wiring harness so the engine will only have 1 connector when installed.
Wednesday, November 3, 2010
Coil on Plug almost ready.
Here is the final product. I just cut up a piece of 3/16" aluminum plate with the angle grinder and drilled some 1-3/8" holes with my step drill bit and then used the bit as a grinder to widen the hole up to 1-5/8".
A little high temp paint and it looks pretty decent. I just need to figure out how to mount it now.
Thursday, October 28, 2010
Engine bay ready for transplant
Doing the final wipe down before I lay down a couple of coats of chassis saver on the engine bay.
Here is the cleaned up bay ready for paint. You don't want to know how dirty it was to begin with.
This is after the second coat. Still very wet.
The front shot. Notice how the masking tape pulled a lot of the paint off around the headlight buckets. I hope the grills will cover this up. Obviously not the best paint job on this thing.
I left the relay holder painted, just a little accent.
Wednesday, October 20, 2010
Struts assembled
Subscribe to:
Posts (Atom)













